Jinan "Honglou 1905" Project

Project Overview

 

"Honglou 1905" is an urban renewal project in the Honglou area of Jinan, aiming to transform old factory buildings into an urban complex integrating cultural creativity, commerce and leisure. The core area of the project is an old German-style factory building built in 1905, with a building area of approximately 8,000 square meters. Due to years of disrepair, the factory building's roof is severely damaged and the internal space utilization rate is low.

Challenges

01

The old factory buildings are historical buildings under protection, and the original building appearance and structural features must be strictly preserved during the renovation process;

02

The factory has a large interior space, and traditional roof repairs are costly, time-consuming, and cannot meet the lighting and ventilation requirements of modern commercial spaces.

03

The renovated space needs to have a flexible layout to accommodate the needs of different business types.

Solution

Solution

Superb provided a customized SP-HB80 air-supported membrane roof system for the project. This system utilizes a semi-transparent PVDF membrane material, ensuring ample natural light while effectively blocking ultraviolet rays. The membrane is installed on the existing factory walls using a special fixing method, preserving the building's historical appearance to the greatest extent possible. It is equipped with intelligent lighting and ventilation systems that automatically adjust according to the indoor environment. A key highlight of the solution is its "openable" air-supported membrane design, allowing the roof to be partially opened on sunny days, creating an open-plan space experience.

Project Data

Project Name

Place

Completion Time

Span

Length

Area

Membrane Material Type

Wind Resistance Level

Special Configuration

Jinan "Honglou 1905" Project

Jinan, Shandong

June 2024

60 meters

133 meters

8000 square meters

Semi-transparent PVDF membrane material

Level 10

Openable membrane roof, intelligent lighting and ventilation system

Outcomes

Natural lighting rate increased by 70%;

The roof renovation project was completed 45 days faster than traditional methods.

Space utilization increased by 35%;

The project's overall energy consumption was reduced by 25%;

The number of visitors exceeded 100,000 in the first month after opening.

Testimonial

"The air-supported membrane roof has injected new vitality into the old factory building. It perfectly balances historical protection and modern functionality, making our project a new landmark in the city."

Unlock Your Custom Quote & Expert Support

Click 'Contact Us' to discuss your requirements. You'll receive a competitive quote and a dedicated account manager to guide your project from concept to delivery.

Ready to Build Your Air Dome?

Ready to Build Your Air Dome?

Get a Free Quote in 24 Hours

Copyright @ Guangdong Magi Dome Intelligent Technology Co., Ltd. All Rights Reserved | Sitemap |privacy

COOKIES

Our website uses cookies and similar technologies to personalize the advertising shown to you and to help you get the best experience on our website. For more information, see our Privacy & Cookie Policy